REGIONAL COOPERATION

Bulgaria and Romania launched Danube Bridge 2 with a grand ceremony


At the opening of the facility, the Prime Minister of the Republic of Bulgaria, Plamen Oresharski, and his Romanian counterpart, Victor Ponta, agreed that the traffic on Danube Bridge 2 will be free of charge for all vehicles up to 00.00 on 1 July 2013. The official ceremony was attended by the President of the National Assembly, Mihail Mikov, the Minister of Transport, Information Technology and Communications, Danail Papazov, the Transport Minister of Romania, Relu Fenechiu, Mugur Isarescu, Prime Minister of Romania in the period 1999 - 2000, the European Commissioner for regional Policy, Johannes Hahn, various government officials and MPs from both sides, experts who have worked on the project over the years and many more.

A total of 415 000 vehicles are forecasted to cross the bridge in the first year of its operation, 186 000 of which are cars, 20 000 buses and 209 000 trucks, as well as 4 745 trains in both directions, 730 of which are passenger and 4 015 freight trains. At the end of the period (2030), the number of freight trains in both directions is expected to reach 8 504. Further traffic is expected to be generated from Greece, Turkey, Macedonia and the neighboring region of Serbia.

The inauguration ribbon was cut by two construction workers –one Bulgarian from Vidin and one Romanian from Calafat, who have been working at the facility since its beginning.

The total amount of funds from the grants and the loans amount to about half a billion leva and they are fully absorbed.

Both sides had to overcome not only the differences in the legislation, but also the unfavorable effects of the deepening general economic crisis. The project for the construction of the combined road and rail bridge over the Danube at Vidin - Calafat is unique not only at a regional, but also at an European level. The total length of the road part of the bridge is 1391 m, and the length of the railway - 1791 m.

The bridge facility is unique and is composed of three parts: railway overhead road in ten holes up to 40 m and a total length of 400 m, a bridge over the non-navigable channel of the Danube river eight holes of 80 m, and one over the navigable channel part of the river of the five holes of which three, in a 180 m.

NEWS FROM BCCI
Transparency of public procurement was discussed with representatives of the U. S. Department of Commerce
BCCI brought suggestions on improving the public procurement administration Още
Forthcoming conference dedicated to creating new opportunities for business and trade relations with Ukraine
The Free Trade Agreement between the EU and Ukraine is expected to be signed at the Eastern Partnership Summit in Vilnius in November 2013 Още
The Ambassador of the Slovak Republic visited the Bulgarian Chamber of Commerce and Industry
Initiatives for intensification of the cooperation between Bulgarian and Slovak companies were discussed at the meeting Още
Opening of the Information Exchange Centre under the “CONNECTION” project
The subject refers to the information exchange, knowledge and good practices in the state, private and public sector in the cross-border region Още
INVEST IN BULGARIA
Building of Sofia – Bozhurishte Economic Zone has started
German company Behr-Hella Thermocontrol GmbH is the first tenant in the Sofia – Bozhurishte Economic Zone Още
Сonstruction of a new lift facility in Pamporovo winter resort has started
BULGARIAN ECONOMY
Urgent measures for stabilization and improvement of the living conditions of Bulgarian citizens and for creating better business climate
The National Assembly has approved the proposed by the cabinet urgent measures for stabilization…. Още
The Minister of Finance: For the moment we are not considering any budget revision, but only optimisations
Quarterly labour cost index - First quarter of 2013
The total hourly labour cost grew by 4.2% in industry and by 4.8% in services Още
REGIONAL COOPERATION
Bulgaria and Romania launched Danube Bridge 2 with a grand ceremony
The first month of the operation of Danube Bridge 2 will be free of charge Още